Crawlspace Water Mitigation - Piegan LPOE-Babb
Subject: Crawlspace Water Mitigation - Piegan LPOE-BabbSolicitation Number: 47PD5526R0039Notice Type: SOLICITNAICS: 236220Set-Aside: Total Small BusinessNotice Published: 06-18-26Response Due: 07-10-26Agency: General Services AdministrationOffice: PUBLIC BUILDINGS SERVICEContact: John Morelion This email address is being protected from spambots. You need JavaScript enabled to view it.Office Address: Washington, DC 20405Place of Performance: Babb, MT
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The Piegan LPOE Port has water accumulation under the main port building that needs to be mitigated. This will be accomplished by the installation of French drain system around the perimeter of the building foundation footings. French drains once installed will empty into contractor supplied sump pumps to collect water to be pumped out into the storm drain system. A new vapor barrier will be installed to damper any ground source water evaporation from occurring under the building.