L7-090 Repair and Liner - Chemical Storage Tanks


Subject: L7-090 Repair and Liner - Chemical Storage Tanks
Solicitation Number: FA857126Q0087
Notice Type: SOLICIT
NAICS: 238990
Set-Aside: No Set aside used
Notice Published: 07-01-26
Response Due: 07-02-26

Agency: Department of the Air Force
Office: FA8571 MAINT CONTRACTING AFSC PZIM
Contact: Nikia Streeter This email address is being protected from spambots. You need JavaScript enabled to view it.
Office Address: ROBINS AFB, GA 31098-1672
Place of Performance: GA 31098

Related Notices:
        07-01-26 SOLICIT

        07-01-26 SOLICIT


Click for official SAM (FBO) notice, additional information, and accompanying attachments

This solicitation is being conducted under Simplified Acquisition Procedures (SAP) as a Request for Quote (RFQ) No. FA857126QOO87. This requirement is being solicited as a single source requirement to the Original Equipment Manufacturer (OEM) for the repair of L7-090 Liner and purchase of one (1) additional L7-090 Liner. The Contractor shall provide all the tools, parts, materials, equipment, labor, repairs, and travel necessary to perform repairs on the existing Polyvinylidene Flouride (PVDF) L7-090 Liner for the Chemical Storage Tank in Building 20128 and supply one (1) new L7-090 Liner for the Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia. The Contractor shall repair the existing liner in the facility inside of L7-090. The additional spare liner shall be identical in contruction, material, and instrumentation to the existing liner and be stored by CMXG for future use. The Contractor shall provide the following: ? Repair of L7-090 Liner on Tank 120 at Building 20128. This will include one (1) technician to facilitate repairs. ? 1 each (PVDF) Kynar? Rigid Box Liner to fit CMXG?s existing tank ? Approximately 48? x 48? x 72? deep, fabricated from ?? thick Kynar 2850 Flex sidewalls and rim and 3/8? thick Kynar 2850 Flex bottom. Liner will be fabricated incorporating Patented (#8,133,345) N-FUZE lining technology, utilizing pressure butt-welded vertical joints and extrusion welded sidewall to bottom contruction. The tank shall have one (1) 45 degree corner where CMXG can re-install existing TANKeye Plus Leak Dectection System Amendment 0001 corrects Period of Performance for CLIN 0002 and adjust responses due date to account for the High Priority need of this effort.