AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAION
Subject: AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAIONSolicitation Number: FA822426Q0003_1Notice Type: SOLICITNAICS: 238220Set-Aside: Total Small BusinessNotice Published: 07-30-26Response Due: 08-05-26Agency: Department of the Air ForceOffice: FA8224 AFSC OL H PZIMContact: Willie Little This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (801) 586-6837Office Address: HILL AFB, UT 84056-5805Place of Performance: Hill Air Force Base, UT 84056Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The purpose of this Amendment 0001 is to: Block 14 (Description of Amendment/Modification): 1. Provide the Government's official responses to all contractor questions received. 2. Formally amend the Statement of Work (SOW) Section 2.1. The required Installation Completion Deadline is hereby changed from 12 August 2026 (as originally stated on the SOW) to 17 August 2026. 3. Incorporate the attached Question & Answer table. All other terms and conditions of the solicitation remain unchanged. Offerors must acknowledge receipt of this amendment with their quotation. Reference the newly attached supporting amemdment documents: 1. SF 1442 2. Attachment_1_SOW_AMXG26036(Amended)REVISED_24Jul2026. 3. FA822426Q0003_Amendment_0001 The Air Force is soliciting a 100% Small Business Set-Aside for a contractor to install and integrate a Government-furnished compressor and cooling system at Hill AFB, Utah. Key Project Details: The Work: The contractor will provide the labor, tools, and standard materials (piping, wiring, epoxy) to physically install two government-owned Ingersoll Rand compressors, dryers, and glycol coolers into Building 269 and connect them to the base's 460V power and air loop. The Constraints: All primary machinery is Government Furnished Property (GFP). Facility drawings are Controlled Unclassified Information (CUI) requiring vetted SAM.gov access. Davis-Bacon prevailing wages apply. Critical Deadlines: Site Visit RSVP Deadline: 20 July 2026 Pre-Quote Site Visit: 23 July 2026 Contractor Q&A Deadline: 27 July 2026 Quotes Due: 05 August 2026 Mandatory Completion: On or before 17 August 2026 (Strict deadline to preserve the manufacturer's warranty).