GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado
Subject: GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, ColoradoSolicitation Number: 1240LT26Q0107Notice Type: SOLICITNAICS: 237110Set-Aside: Total Small BusinessNotice Published: 08-07-26Response Due: 09-15-26Agency: Department of AgricultureOffice: FOREST SERVICEContact: James Edington This email address is being protected from spambots. You need JavaScript enabled to view it.Office Address: WASHINGTON, DC 20250Place of Performance: Leadville, CO 80461Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
This project involves installing a new 2-inch HDPE waterline beneath Colorado Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting the new waterline from Dwelling 1 to the existing distribution system, replacing the well pump to provide a 15 GPM supply, installing a dual?stage booster pump and basement water storage, and performing associated electrical upgrades such as relocating meters, burying service lines, upgrading panels, and supporting septic and booster pump systems. The project also replaces multiple septic systems serving the Blue House, Brown House, Bunkhouse, and Shop, installs new sewer and dosing infrastructure, and includes asphalt removal along with new road and gate installation.