Picosecond Laser Driver and Head


Subject: Picosecond Laser Driver and Head
Solicitation Number: 6-B185-Q-00413-00
Notice Type: SOLICIT
NAICS: 334516
Notice Published: 08-20-26
Response Due: 08-25-26

Agency: Department of Energy
Office: ENERGY, DEPARTMENT OF
Contact: Laura Sanchez This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (630) 252-1621
Office Address: Lemont, IL 60439
Place of Performance: Lemont, IL 60439


Click for official SAM (FBO) notice, additional information, and accompanying attachments

*THIS RFQ WILL BE EVALUATED BASED ON LOWEST PRICE, TECHNICALLY ACCEPTABLE METHODOLOGY* Looking to source the following equipment: Diode Laser Driver A picosecond-pulse diode laser driver with the following specifications: Operation modes: Pulsed or continuous wave (CW) Wavelength range: 266?nm to 1990?nm Pulse duration: As short as 40?ps FWHM with picosecond precision Repetition rates: 2.5?kHz to 80?MHz, selectable from base frequencies of 80?MHz or 1?MHz, divided by 1, 2, 4, 8, 16, or 32 Jitter: Typical 3?5?ps, enabling sub?picosecond timing stability Triggering: External TTL trigger input (5?V, adjustable level), sync output for synchronizing with other instruments, and dual gating inputs (slow and fast) for time?resolved control Power supply: 110/120?VAC or 220/240?VAC, 50/60?Hz, max 45?W Dimensions: 237???310???97?mm Warranty: 5?year limited warranty Laser Head A picosecond?pulse and cw?capable laser head with the following specifications: Wavelength: 375 nm (?10 nm) Pulse width: < 90 ps (typical) Repetition rate: Up to 40 MHz Average optical power: 5 mW (typical) CW power: 40 mW Peak power: Up to 1 W Beam divergence: ~0.0063? (parallel) Numerical aperture: 0.55 Polarization: Horizontal, extinction ratio >10 Operation modes: Pulsed, burst, continuous wave (CW) Cooling: Thermoelectric (TE) cooled Optional: Fiber coupling (single-mode, multi-mode, polarization-maintaining) Please review all applicable documentation and provide a proposal response no later than 5:00 PM CST August 25, 2026. Within your proposal, please include a fully executed copy of the ANL-70 Request for Quotation and the ANL-70A Reps & Certs. Any questions can be directed to the Contracting Officer prior to 5:00 PM CST August 24, 2026. Thank you in advance for your participation.