USCGC Stratton Shaft Alignment and Bearing Reaction Check


Subject: USCGC Stratton Shaft Alignment and Bearing Reaction Check
Solicitation Number: 70Z08526Q0026058
Notice Type: SOLICIT
NAICS: 811310
Set-Aside: Total Small Business
Notice Published: 09-14-26
Response Due: 09-21-26

Agency: Department of Homeland Security
Office: US COAST GUARD
Contact: Justin Wooldridge This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (206) 820-5327
Office Address: ALAMEDA, CA 94501
Place of Performance: Alameda, CA 94501


Click for official SAM (FBO) notice, additional information, and accompanying attachments

Statement of Work CGC Stratton Shaft Alignment and Bearing Reaction Check Intent: contractor must measure and report to USCG the Vertical and Horizontal Loads on the (2) bull gear bearings and (2) intermediate bearings, stern and strut bearings, using the Strain Gage Method. Period of Performance: 01 November 2026 ? 01 January 2027 Location: USCGC Stratton, 42 Eagle Road Coast Guard Island, Alameda CA 94501 Contractor will install a total of (5) full bridge strain gage sets on the Port shaft, and (5) strain gage sets on the Starboard shaft, to complete the bearing load calculations. Contractor will also measure and report the vertical load on each line shaft bearing using the Hydraulic Jack/Load Cell method. Contractor will provide all specialty tools and calibrated instrumentation necessary to install the strain gages and measure the strain gage data. Contractor shall provide a final written report within 15 days after completion of the work covered by this scope of work. The report shall contain at a minimum the following: Introduction and References Project description Alignment calculations Alignment tests with strain gages Conclusions Recommendation for future action Data sheets on shaft model used to obtain reported results e.g. stations, strain gauge locations, diameters, lengths, load points, etc. Data sheets from Computer runs that computed reported results e.g. stations, deflections, stresses, bearing reactions, slopes, etc. References: Coast Guard Drawings Coast Guard Drawing 750 WMSL 114-001, Rev B, Fairwaters and Rope Guard Installation Details & L/M (ASC114001) Coast Guard Drawing 750 WMSL 243-007, Rev E, Propulsion Shafting System Arrangement (ASC243008) Coast Guard Drawing 750 WMSL 243-008, Rev -, Propulsion Shafting and Appendage (ASC243001B) Coast Guard Drawing 750 WMSL 244-001, Rev -, Propulsion Shafting System Measured Bearing Reaction Report (ASC244001) Coast Guard Drawing 750 WMSL 244-002, Rev B, Stern Tube Seal & Strut Bearings Arrangement & Details & L/M (ASC244002) Coast Guard Drawing 750 WMSL 244-003, Rev -, Propulsion Shafting System Measured Bearing Reaction Report (AS2244001 Notes: For any references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number to the listed point of contact for this work. For questions regarding this statement of work, contact LTJG Maximos Brady This email address is being protected from spambots. You need JavaScript enabled to view it.