Fire Extinguisher Service
Subject: Fire Extinguisher ServiceSolicitation Number: PANMCC-26-P-0000054269Notice Type: PRESOLNAICS: 811310Set-Aside: Total Small BusinessNotice Published: 09-14-26Response Due: 09-08-26Agency: Department of the ArmyOffice: W6QM MICC-FT STEWARTContact: Jack Konrat This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (571) 801-3844Office Address: FORT STEWART, GA 31314-3324Place of Performance: GA 31409Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
This is a non-personnel services contract to provide an initial assessment visit, pickup, inspections/maintenance, and delivery of 1239 fire extinguishers of various types and sizes pickup from various building locations on Hunter AAF. Each battalion within the brigade will schedule consolidated fire extinguisher services separately, on a quarterly basis, during this period. Contractor visits will occur at buildings 7901, 850, 860 and 1296 on HAAF. Services will be provided on a quarterly basis. Extinguisher Inventory 10LB: ABC 150 BC 28 Purple K 17 CO2 3 Halon 2 50LB: ABC 14 5LB: ABC 548 15LB: ABC 51 20LB: ABC 420 125LB: ABC 6 5. Specific Tasks: Tasks will be performed in accordance with NFPA 10, AR 420-5, and OSHA regulations. 5.1. The Contractor shall execute quarterly service dispatches to inspect and remediate 100% of inventory fire extinguishers, ensuring correction of all deficiencies within 5 business days. 5.2. The required fire extinguisher periodic maintenance includes annual inspections, 5/6 years maintenance (depending on the extinguisher type), and 10/12-year hydrostatic testing (depending on the extinguisher type). 5.3. Pressurized fire extinguishers require the following services (inspection, maintenance, and/or hydrostatic testing). 5.4. New extinguishers require an initial inspection to confirm the weight, pressure, condition, and provide the record on an inspection tag; all conducted by qualified personnel. 5.5. Annual inspections/maintenance includes full mechanical check, weighing, and servicing by qualified personnel. 5.6. During 5/6 year maintenance, extinguishers must be disassembled, emptied, and serviced. 5.7. Hydrostatic testing involves the same process as 5/6 year maintenance with an addition structural test to ensure cylinder integrity. 5.8. 14 Days to perform service, unless an understanding is agreed upon between the unit POC, the contracting officer, and the contractor. In the event a unit is activated for deployment, the Government will not be responsible to pay for the quarterly services not used under the contract. The contractor will be notified by the COR, in writing, explaining the length of the deployment and the period during which services will not be required for a particular unit. The contractor will cease billing during the period during which services will not be required for a particular unit.