FY27 GNV Rebuild Cooling Towers
Subject: FY27 GNV Rebuild Cooling TowersSolicitation Number: 36C24827Q0023Notice Type: SOLICITNAICS: 333413Set-Aside: Service-Disabled Veteran-Owned Small BusinessNotice Published: 09-15-26Response Due: 09-25-26Agency: Department of Veterans AffairsOffice: VETERANS AFFAIRS, DEPARTMENT OFContact: Jeremy Parrish This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (352) 283-9220Office Address: TAMPA, FL 33637Place of Performance: Gainesville, FL 32608Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The Department of Veterans Affairs seeks a qualified contractor to provide repair and replacement services for cooling tower components and associated equipment. All work shall account for equipment degradation, environmental conditions, and safe accessibility in accordance with proper operations and maintenance practices. The contractor shall: ? Procure new drift eliminators and all listed replacement components for the cooling towers. ? Deliver all materials to the Malcom Randall VA Medical Center, Gainesville, FL. ? Install new drift eliminators, replacement panels, and all specified components. ? Provide all additional parts, materials, and equipment necessary to restore both cooling towers to full operational condition in accordance with manufacturer specifications. This effort will be performed at the Malcolm Randall VA Medical Center in Gainesville, Florida. BAC Cooling Tower ? Model BAC 3728A, Three (3) Cells The contractor shall remove defective components, install new replacement parts, and verify proper operation of each cooling tower cell. Any additional parts required to meet manufacturer specifications shall be furnished by the contractor. Required Replacement Components: ? Quantity 3 ? Shaft Assembly Kits (shaft, bearings, bushing, hardware) ? Quantity 3 ? Fan Assemblies ? Quantity 3 ? Cooling Tower Rated Motors ? Quantity 3 ? Belts ? Quantity 3 ? Motor Sheaves ? Quantity 3 ? Fan Sheaves ? Quantity 6 ? Sealer Tape (for leak mitigation) EVAPCO Cooling Tower ? Model CTSN 8 351974, Six (6) Cells The contractor shall remove defective components, install new parts, and restore the cooling tower to full manufacturer operating specifications. All removed components must be properly disposed of off-site. The contractor shall also ensure safe access to framed louvers and other components requiring service. Required Replacement Components: ? Quantity 4 ? OEM Cooling Tower Motors ? Quantity 6 ? OEM Belts ? Quantity 5 ? Shaft Assembly Kits (shaft, bearings, bushing, hardware) ? Quantity 2 ? Fill Media ? Quantity 2 ? Drift Eliminator Kits ? Quantity 32 ? Framed Louvers