Fort Lee Vehicle Recovery Range


Subject: Fort Lee Vehicle Recovery Range
Solicitation Number: W9123626BA006
Notice Type: SOLICIT
NAICS: 236220
Set-Aside: Competitive 8(a)
Notice Published: 09-29-26
Response Due: 10-13-26

Agency: Department of the Army
Office: W2SD ENDIST NORFOLK
Contact: Michael Stevenson This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (757) 201-7233
Office Address: NORFOLK, VA 23510-1096
Place of Performance: Fort Lee, VA

Related Notices:
        08-25-26 SOLICIT

        07-17-26 SOLICIT

        06-18-26 SOLICIT

        06-29-26 SOLICIT

        09-29-26 SOLICIT

        10-16-26 SOLICIT

        07-21-26 SOLICIT

        08-04-26 SOLICIT


Click for official SAM (FBO) notice, additional information, and accompanying attachments

Note: Please see amendment 0006 for the final drawings and specifications. Amendment 0007: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0007, extending the bid due date and bid opening date. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.