J041--Condenser Coils Replacement for the VA Illiana Health Care System (VAIHCS), located at 1900 E. Main Street, Danville, IL 61832.


Subject: J041--Condenser Coils Replacement for the VA Illiana Health Care System (VAIHCS), located at 1900 E. Main Street, Danville, IL 61832.
Solicitation Number: 36C25227Q0051
Notice Type: SOLICIT
NAICS: 238220
Notice Published: 10-27-26
Response Due: 11-04-26

Agency: Department of Veterans Affairs
Office: VETERANS AFFAIRS, DEPARTMENT OF
Contact: Eric M King, Contractor This email address is being protected from spambots. You need JavaScript enabled to view it.
Office Address: MILWAUKEE, WI 53214

Awarded to:

Related Notices:
        10-28-26 SOLICIT

        10-28-26 SOLICIT

        10-15-26 SOLICIT

        10-15-26 SOLICIT

        10-15-26 PRESOL

        10-27-26 SOLICIT

        10-27-26 SOLICIT


Click for official SAM (FBO) notice, additional information, and accompanying attachments

Vendor Questions This amendment incorporates the Government s responses to questions submitted by potential offerors. These questions and corresponding answers are provided for clarification purposes only and do not revise or otherwise change the requirements unless explicitly stated within this amendment. Q: Please confirm how quotes are to be submitted: by email to This email address is being protected from spambots. You need JavaScript enabled to view it., or to the Great Lakes Acquisition Center address in SF 1449 block 9 and advise any required subject line or file format. A: This email address is being protected from spambots. You need JavaScript enabled to view it. A: Return file as one document with any attachments included (PDF Preferred). A: No special subject line necessary. Q: Please provide the serial number from the CGAM060F2A nameplate, needed to order the OEM coils. A: The serial number is U10A13482 (See Picture on Last Page) Q; Is the chiller at Building 14 installed at grade or on a roof? A: The chiller is installed at grade. Q: Please confirm whether certified payroll submissions are required for the condenser-coil replacement work and identify the applicable clause and reporting instructions. A: Not Required Q: Clarification regarding refrigerant quantities, existing piping leaks, coil procurement lead times and the period of performance, and key personnel requirements. A: Period of Performance is date of award plus 30 days, per the solicitation schedule of items (B.2). This answers the coil procurement lead times. A: No Key Personnel requirements. Q: The VAAR 852.219-75 certification in the package appears with both the services limitation (50%) and the special trade construction limitation (75%, cost of materials excluded) presented. Which limitation governs this requirement? A: The correct block is Services not Special Trade Construction. So, disregard the Special Trade Construction block, as it is not applicable to this RFQ. i) [X] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6. Q: If MK2E purchases the OEM replacement coils directly and a local subcontractor performs installation labor only, please confirm that structure is consistent with the governing limitation's calculation (materials excluded under the special trade construction prong. A: That block was incorrectly checked. See question five (5) answer. PWS 2.1 Task 4 (B)-(C) Additional Refrigerant: Q: Please confirm whether R-410A needed to replace a pre-existing shortage or loss from the existing system will be Government-furnished or separately compensated through a contract modification. A: Additional R-410A will be government furnished. PWS 2.1 Tasks 4 (A) and (B) Refrigerant Leaks Q: Existing Refrigerant Piping Leaks If additional leaks are detected outside of the condenser coils, this must be immediately brought up to the COR and CO to determine next steps Q: Coil Lead Times: A: The repair must be conducted within the time frame of the period of performance. Any issues with sourcing materials will be addressed on a case-by-case basis. PWS 9.1; Project or Site Supervisor: Q: Please confirm whether a dedicated Superintendent or Site Supervisor is required, the minimum qualifications, and whether continuous onsite presence is required whenever work is performed. Must this individual be a direct W-2 employee of the prime contractor, or may a qualified subcontractor employee serve under the prime contractor s direction and authority? Yes FAR 52.236-6, Superintendence by Contractor, mandates that at all times during contract performance from NTP through completion-the contractor must either directly superintend the work or assign a competent superintendent who * is satisfactory to the Contracting Officer (CO) * has authority to act on behalf of the contractor on-site. PWS 9.1(d); applicable safety requirements Q: Please confirm whether a designated SSHO is required and identify the minimum training, certifications, experience, and onsite attendance requirements. Must the SSHO be a direct W-2 employee of the prime contractor, or may a qualified subcontractor employee serve in this role? Yes. Contracts governed by VA specifications, a qualified employee of a subcontractor can serve as SSHO if they have formal delegation of authority from prime and their appointment is submitted and approved by the CO with adequate supporting documentation. PWS 8.3 Quality Control Manager Q: The PWS requires a Quality Control Plan. Please confirm whether a dedicated QCM is also required, and identify minimum qualifications, certifications, and onsite attendance requirements. Must the QCM be a direct W-2 employee of the prime contractor, or may a qualified subcontractor employee serve under the prime contractor s QCP? Yes, can be direct prime or subcontractor employee. Must be qualified and given formal delegation of authority. Named in quality control plan and presented to the Contracting Officer. Meet all qualifications and certifications specified. PWS 8.3 and 9.1 Combined Key Personnel Roles: Q: Please confirm whether one qualified individual may serve concurrently as Superintendent/Site Supervisor, SSHO, and QCM, or in any combination of these roles. If separate personnel are required, please identify the roles that must be separated and whether each must remain onsite whenever work is performed. Yes, they must be physically present on-site whenever work is being performed, satisfying presence requirements for all assigned roles. All other terms and conditions remain unchanged. The RFQ response date remains unchanged.